PRESS RELEASE - From LNG INDUSTRY MAGAZINE - October 2022

Marco Di Nicola, Sara Evangelisti, and Alessandra Isetto, Gas and Heat, Italy, detail the use of special grade austenitic steel for LNG and alternative fuels tank applications. Based on the International Maritime Organization's strategy, the world will have the opportunity to reach the goal of decarbonisation in the future through green fuels. However, to date,...

PRESS RELEASE - GAS AND HEAT AND BUREAU VERITAS MAKE CARGO/FUEL TANK COMPATIBLE WITH BOTH LNG AND AMMONIA

Paris La Défense, September 12, 2022 - Bureau Veritas (BV), a world leader in testing, inspection and certification, has awarded an Approval in Principle (AIP) to Gas and Heat (GH), a company specializing in the design, construction and integration of Liquefied Gas Handling Systems both for Marine and Onshore installations, for their flexible solution for...

LNG & AMMONIA - The first compatible tank

Gas and Heat and Bureau Veritas make cargo/fuel tank compatible with both LNG and Ammonia Milan September 2022 - Bureau Veritas (BV), a world leader in testing, inspection and certification, has awarded an Approval in Principle (AIP) to Gas and Heat (GH), a company specialized in design, construction and integration of Liquefied Gasses Handling Systems both for Marine and Onshore installations for theirflexible solution to transport LNG and ammonia. Through a thorough study, GH supported...

PRESS RELEASE sale of HIGAS shares.

Gas and Heat SpA in recent days sold its 10 percent stake to Higas, thus exiting the corporate structure created in 2015 precisely by Gas and Heat and CPL Concordia. As stated by the CEO, Eng. Claudio Evangelisti "After starting the operation of the first LNG coastal storage facility built in Italy, we consider our mission...

GAS AND HEAT BUNKERING TIME REDUCTION SOLUTION

Gas and Heat has completed the design, manufacturing and assembling of a Docking Skid, named LNG 4 speed (patent pending), especially conceived to connect 4 LNG tank road trucks at a time whereby reducing the vessel's full bunkering time to one sixth of the time. The skid was contracted to Gas and Heat by Transport...