Two huge cryogenic tanks produced by Gas and Heat with San Giorgio del Porto and destined for the Green Pearl LNG bunkering barge ship Green Pearl under construction for Axpo arrived in Genoa from the port of Livorno aboard the heavy lift vessel Poolgracht of the shipping company BigLift (Spliethoff Group).
The cargo set sail in recent days from the port of Livorno, where it had arrived via barge along the waterway from the Pisa manufacturing plant. These two plants weigh 335 and 350 tons respectively and measure 13 x 39 x 16 meters.
Once completed, the ship will be handed over to the charterer after commissioning and operational trials.

